FIRSTPASSDrafting

G-200Construction Set

Construction Drawing Services

Drawings Designed to Communicate How the Project Is Built

Construction drawings translate design decisions into organized information contractors, trades, owners and project teams can use during construction.

8'-1"1A-5015A-5013A-501TYP. WALL SECTION · 3/4" = 1'-0"
Typical Wall Section · Detail CalloutsG-200

Quick Answer · G-200.QA

Construction drawings translate design decisions into dimensioned plans, sections, details and coordinated MEP documentation for the people who price, coordinate and build a project. Contractors, trades, owners and project teams use them during construction. FirstPass prepares or develops construction sets, including floor plans, elevations, wall details and equipment layouts, and can build on an existing permit set when additional construction-level information is needed.

For

Contractors, trades, owners and teams building the project

You receive

Dimensioned construction documentation coordinated across disciplines

Depending on scope, FirstPass can prepare or develop documentation including:

  • Dimensioned floor plans
  • Demolition plans
  • Reflected ceiling plans
  • Interior elevations
  • Exterior elevations
  • Building sections
  • Wall and assembly details
  • Door and window information
  • Finish information
  • Equipment layouts
  • Electrical drawings
  • Plumbing drawings
  • Mechanical drawings
  • Coordinated details

G-201Set Intent

Permit Drawings vs. Construction Drawings

These terms are sometimes used interchangeably, but the intent can differ.

G-100 · For Review

Permit Drawings

Permit drawings focus on what the reviewing authority needs to evaluate the proposed work.

Permit plan sets

G-200 · For Construction

Construction Drawings

Construction drawings focus more broadly on communicating the project to the people responsible for estimating, coordinating and building it.

This page

NoteA project may use the same drawing package for both purposes, or it may require additional construction-level information beyond the permit set.

G-202Detail Level

When More Detail Matters

Construction documentation becomes especially valuable when:

  • D-01Multiple trades must coordinate work
  • D-02Existing conditions affect installation
  • D-03The project contains custom assemblies
  • D-04Equipment locations matter
  • D-05The contractor needs dimensioned information
  • D-06Owner decisions must be documented
  • D-07Construction details extend beyond permit minimums

G-203Coordination

A Coordinated Documentation Workflow

Where multiple disciplines are included, FirstPass develops related sheets so information can be reviewed across the package rather than treating every plan as an isolated file.

That may include checking relationships between architectural layouts and:

  • Electrical equipment
  • Plumbing fixtures
  • Mechanical equipment
  • Ceiling conditions
  • Shafts and chases
  • Equipment clearances
  • Openings
  • Structural information supplied by the appropriate professional

RFIClarifications

Construction Drawing FAQs

Response

Not necessarily as a separate package. A permit set may provide enough information for both review and construction, while other projects benefit from additional construction details.

Response

Potentially. The existing set and project requirements should be reviewed first to identify what additional information is needed.

Response

They can. Architectural, electrical, plumbing and mechanical drawings can be coordinated when those disciplines are included.

Response

Not automatically. Shop drawings, fabrication drawings and manufacturer-specific submittals are distinct deliverables and must be specifically included if offered.

SUB-001Submittal

Start With the Project, Not a Package

  • –Send the address and a description of the work.
  • –We help define the drafting scope before work begins.