Turn Construction Changes Into an Organized Final Drawing Record

Record drawings update project documents to reflect changes reported during construction.

REDLINESA-101 · PLAN2A-101 · PLAN29'-4"RECORD SETREV2CHANGES INCORPORATED
Redlines Incorporated Into the Record SetRD-100

Quick Answer · RD-100.QA

Record drawings update a project's documents to reflect the changes reported during construction. Contractors, owners and project teams who need a clean final drawing record after closeout use this service. FirstPass incorporates contractor redlines, RFIs, field change notes and change directives into an organized record set, coordinates the affected sheets and clearly identifies the basis of the finished documents.

For

Contractors, owners and project teams closing out construction

You receive

A clean, organized record drawing set with its basis identified

They are commonly developed from:

  • Contractor redlines
  • Field change notes
  • RFIs
  • Change directives
  • Revised sketches
  • Updated equipment information
  • Final construction documentation supplied by the project team

NoteFirstPass incorporates the provided record information into a clean drawing package.

RD-101Definitions

Record Drawings vs. As-Built Drawings

The distinction is important.

RD-100Documented basis

Record Drawings

Record drawings generally reflect documented changes supplied by the project team.

Redline to CAD

EX-100Observed basis

As-Built Drawings

As-built/existing-condition drawings may involve documenting the physical conditions actually observed or measured.

As-Built Drawing Services

General Note

FirstPass identifies the basis of the documents clearly so the finished drawings are not represented as field-verified when they were produced solely from third-party markups.

RD-102Workflow

Typical Record Drawing Workflow

The sequence from received markups to the issued record set.

  1. 1

    Receive the latest drawing set.

  2. 2

    Collect redlines and change documents.

  3. 3

    Identify superseded information.

  4. 4

    Incorporate documented revisions.

  5. 5

    Coordinate affected sheets.

  6. 6

    Issue the final record set in the agreed format.

RFIClarifications

Record Drawing FAQs

Response

Yes, provided the file can be opened and is suitable for continued editing.

Response

Yes.

Response

Not unless the project scope specifically includes an appropriate verification process. The drawings should accurately disclose their source.

Response

Yes, where those disciplines are included in the project scope.